Key takeaways:
- A 3D printing quote is waiting on you, not on us, because without certain information we cannot begin.
- The most common mistakes are not technical. They are organisational and communicational.
- Each of the situations below can be resolved with one sentence before sending your inquiry.
You may be wondering why a 3D printing supplier asks so many questions before providing a quote. Or why your inquiry never received a response at all. You sent the model, wrote the deadline, and silence.
The reason rarely lies with us. It more often lies in the information that came with your inquiry, or rather the information that did not. At the end you will find an AI prompt. Using your AI assistant, you can prepare a complete inquiry in approximately ten minutes, on the basis of which we can prepare a quote. Below are four situations we see regularly. You may recognise yourself in one
of them.
Mistake #1: You send a model, not a purpose
Situation: “Please quote for 3D printing of the attached STL.”
Why this happens: When we receive such an email, we do not know whether it is a visual prototype, a functional part, a replacement component, or series production. Each option requires a different technology, material, and tolerances. We begin asking questions, and because the procurement officer often does not have those answers to hand, as they were not aligned with the development team, the questions move along the chain. Answers come slowly or incompletely. The quote waits on you, not on us.
Instead: One sentence before sending, what exactly will this part be used for? This is not a technical question. It is a project question. Everything else follows from it.
Mistake #2: You specify the technology in your inquiry
Situation: The email reads: “We need FDM in ABS”, without explaining why.
Why this happens: You think this saves time. In reality, you have tied our hands. Our job is not to confirm your choice, our job is to ensure the part will work. When a technology is already specified in the inquiry, the supplier is expected to confirm rather than suggest an alternative. The supplier then has to open up the question themselves, which means an additional round and a longer time to quote.
Instead: Describe requirements, not solutions. “Functional part, temperature resistance up to 80°C, batch of 50 pieces.” We choose the technology, that is part of our service.
Mistake #3: Procurement sends without involving development
Situation: The inquiry comes from a procurement officer. The development team does not know about it, or was not consulted.
Why this happens: In large companies, each department holds only part of the information. When only procurement sends the inquiry, we receive only part of the picture. Questions move along the chain, procurement officer, supplier, technologist, developer, and get lost or changed along the way. This is not a lack of knowledge on any individual’s part. It is an organisational gap.
Instead: Provide a technical contact at first point of contact. One person who can confirm the material, tolerance, or functional requirements shortens this process by three to five days.
Mistake #4: A prototype for visual review ≠ a prototype for series production
Situation: The model looks appropriate on screen. We produce the part. Only during inspection do details emerge that the technology cannot reliably reproduce.
Why this happens: Nobody clearly stated whether this was a visual prototype for shape review or a part that needs to go into series production later. For us, these are entirely different tasks, different materials, different tolerances, the geometry must be adapted in certain areas. When we discover this after the first part, iterations follow, model changes, additional costs.
Instead: Communicate the project goal, not just the current phase. “Prototype for shape verification” and “prototype that needs to go into series production later” are entirely different tasks for us, and a different price.
What this means in practice
The biggest time consumer for us is not technical assessment. It is waiting, and repeating questions, when procurement and development at the client’s end are not aligned.
A quote that arrives quickly and is usable is not coincidence. It is the result of an inquiry that arrived with clear information.
From mistake to inquiry
We have prepared an AI prompt that guides you through preparing an inquiry, before you send it. It is intended for procurement officers and development engineers who need 3D printing from an external supplier.
Using your AI assistant, you can prepare a complete inquiry in approximately ten minutes, on the basis of which we can prepare a quote.
AI prompt for preparing an inquiry, download it and copy it into your AI assistant.